Difference between revisions of "Precision Pendulum Assembly: Partners"

From wwwelab
Jump to navigation Jump to search
 
(3 intermediate revisions by the same user not shown)
Line 2: Line 2:
 
Mechanical structures in support of high schools replicas have been assembled and constructed with the kind help of CENFIM, Lisbon.
 
Mechanical structures in support of high schools replicas have been assembled and constructed with the kind help of CENFIM, Lisbon.
 
[[File:Cenfim_Logo.jpg‎]]
 
[[File:Cenfim_Logo.jpg‎]]
 +
 +
 +
{|
 +
[[Precision Pendulum Assembly: Calibration| Previous Page (Calibration)]]
 +
|}
 +
 +
==Links==
 +
 +
*[[Montagem do Pêndulo de Precisão: Parceiros | Portuguese Version (Versão em português)]]
 +
*[[Conjunto de péndulo de precisión: Socios  | Spanish Version (Versión en español)]]

Latest revision as of 16:05, 26 August 2021

Partners

Mechanical structures in support of high schools replicas have been assembled and constructed with the kind help of CENFIM, Lisbon. Cenfim Logo.jpg


Previous Page (Calibration)

Links